In the existing building J, the production areas TPN, sterile, cytostatics and genetic engineering are to be implemented on the ground floor, and the required technical areas in the basement, with a gross floor area of 2,000 m².
SPIE LSE Services:
Concept as well as design and approval planning, all trades – Building Services Engineering,