In the existing Building J, the production areas for TPN, sterile, cytostatics and genetic engineering are to be implemented on the ground floor, and the required technical areas in the basement, GFA 2,000 m²
Concept + design and approval planning, all trades –
- Technical Building Equipment
- Construction and interior fit-out
- Laboratory equipment
- Process equipment
Project Timeframe
Planning 12/17–05/18