New construction of a production facility for the manufacture of media and buffer preparations for the existing cGMP production (upstream, downstream)
- General planning – basic design
- Disciplines: process, process automation, clean utilities, architecture,
structural engineering, MEP, qualification
Project Timeframe
Planning 01/24–06/24
